Updrilled the forward bottom skin holes in B04 detail B for the CCP-46 rivets.
Drilled mounting holes for the aft portion of the pitch servo bracket. Drilled rivet holes for the pitch servo doubler plate.
The bottom skin is now ready to be riveted/bolted in place to close the aft fuselage. I won't close it up until I get the tail light installed.
Spent a couple of hours removing the 32 rivets from the vertical stabilizer tip. I need to build a mount for a tail light and run conduit/wires to the light. I'll be installing an LED light, PSA Enterprises 918-75TL, from Aircraft Spruce, their part number 11-07242. Should have done this work back on 12/13/11 before closing up the stabilizer assembly.